2nd Floor Budget Planning Assistance (RAB) at Nurul Iman mosque, Bahari Tiga Village

Authors

  • Muhammad Abdu Universitas Muhammadiyah Buton

DOI:

https://doi.org/10.59110/rcsd.163

Keywords:

Civil Engineering, Nautical Three, RAB, Working Drawing

Abstract

This research aims to assist the analysis of the cost budget for the continuation of the construction of the 2nd floor of the nurul iman mosque of the third nautical village so that in determining the amount of costs, material needs can be known in more detail so as to minimize the risk of spending overruns in the use of the budget. In determining costs, the analysis is calculated based on the planned work drawings. With a total budget of four hundred and fifty-four million.

References

Annisa., Ilham., Gaos, Yogi Sirodz., & Wiradinata, Irvan. (2020). Perencanaan Masjid Sumedang. Jurnal Aplikasi Ipteks. http://jurnal.unpad.ac.id/dharmakarya/article/view/26357.

Arie Wibawa, B., & Septina Saraswati, R. (2016). Perencanaan Pembangunan Masjid Al-Ikhwan Kelurahan Karangayu, Semarang. E-DIMAS: Jurnal Pengabdian Masyarakat. http://journal.upgris.ac.id/index.php/e-dimas/article/view/1034.

Isramaulana, A. (2016). Rencana Anggaran Biaya Untuk Sumur Resapan Masjid Besar Kota Banjarbaru. INFO-TEKNIK, 15(2), 239–254. https://doi.org/10.20527/INFOTEK.V15I2.226

Muh. Sayfullah. S, M. W. O. R. Zain. H., & Eryck, M. F. (2021). Perencanaan Design Musholah Al-Fatah SDN 20 Lakudo Desa Madongka Kecamatan Lakudo Kabupaten Buton Tengah. Jurnal Pengabdian Pada Masyarakat MEMBANGUN NEGERI, 5(1), 184–188. https://doi.org/10.35326/PKM.V5I1.1176

Musdinar, I., Sihing, S., Mawantu, Y., Kurniawan, D., & Broto, S. (2022). Penyusunan RAB Renovasi Masjid Al-Hasanah di kel. KREO Selatan, kec. Larangan kota Tangerang. AMMA : Jurnal Pengabdian Masyarakat, 1(06). https://journal.mediapublikasi.id/index.php/amma

Novita Sari, S., Tiara Ramadhanti, A., & Triwuryanto. (2022). Perhitungan Rancangan Anggaran Biaya Embung Desa Kalirejo, Kulon Progo DIY. JOMPA ABDI: Jurnal Pengabdian Masyarakat, 1(2). https://jurnal.jomparnd.com/index.php/jpabdi

Downloads

Published

2023-04-24

How to Cite

Abdu, M. . (2023). 2nd Floor Budget Planning Assistance (RAB) at Nurul Iman mosque, Bahari Tiga Village. Room of Civil Society Development, 2(2), 66–70. https://doi.org/10.59110/rcsd.163

Similar Articles

You may also start an advanced similarity search for this article.